Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee

33,95 €
doručenie ZADARMO

Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee

  • Značka: Unbranded
Predáva:

Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee

  • Značka: Unbranded

33,95 €

Ušetrite 7,00 € (17%)

RRP

40,95 €
Na sklade
doručenie ZADARMO

Politika vrátenia 14 dní

Predáva:

33,95 €

Ušetrite 7,00 € (17%)

RRP

40,95 €
Na sklade
doručenie ZADARMO

Politika vrátenia 14 dní

Akceptujeme nasledovné platobné metódy

Popis

Double Dog Leash - No Tangle Splitter for Two Dogs, Coupler with Adjustable Long Lead Rope, Dual Control Handles, Retractable No Pull Bungee

Material:Steel,Nylon
  • Značka: Unbranded
  • Kategória: Vodítka
  • Farba: Blue
  • Fruugo ID: 447341863-939747386
  • EAN: 6268230128978

Dodanie a vrátenie

Odoslané do 24 hodín

  • STANDARD: Zadarmo - Doručenie medzi pi 26 decembra 2025–pi 02 januára 2026 - Zadarmo

Doručenie od Čína.

Snažíme sa, aby sme výrobky, ktoré si objednáte, doručili celkom v súlade s vašou špecifikáciou. Ak by ste však dostali neúplnú objednávku alebo iný tovar ako ten, ktorý ste si objednali, alebo existuje nejaký iný dôvod, prečo nie ste s objednávkou spokojní, môžete objednávku alebo niektoré produkty z nej vrátiť a za tovar dostať plnú náhradu. Pozrite si všetky pravidlá vrátenia